  • Brass Metering SCADA upgrade Project for Agip Brass Terminal Operations
  •  Gas Metering system for NAOC AKRI OGUTA Station.
  •  Installation & Commissioning of ESD valves on Oso Platform for Exxon Mobil.
  •  Upgrade of NAPS Production Platform.
  •  Commissioning of the M14 Metering Facility on Sendje Berge FPSO for ADDAX.

pt2

    • Upgrade of NAOC Brass Terminal Control Room
    • Upgrade and maintenance of Exxon Mobil QIT crude and condensate metering systems.
    • Reactivation of gas metering systems for SPDC for 8 flow stations.
  • Calibration of 16” Bi-directional Prover loop for Agip Energy at the Agbara meter Bank, Brass March 2007